REAL PROJECT-SITE PHOTO Connected production line
The site overview shows production equipment installed along the transfer route.
The project record identifies a 200 m³/day design basis for EPS self-insulating blocks and includes site media for mould circulation, cutting and finished products. Actual operating results depend on materials, formulation, shifts and site conditions.
REAL PROJECT-SITE PHOTO The site overview shows production equipment installed along the transfer route.
REAL CUTTING EQUIPMENT The cutting area is shown as part of the project rather than as a generic equipment image.
REAL MOULDING PROCESS Site media records moulds and fresh material within the production route.
REAL FINISHED PRODUCT The project file includes finished-product media for the specified EPS self-insulating block direction.
The 200 m³/day figure belongs to the project. Final daily output depends on the confirmed formula, product sizes, mould cycle, curing, cutting rhythm, shifts and operating management.
Factory, equipment, installation and production images from this customer project.
Tell us what you plan to produce and where the factory will be built.
HENGDE VIDEO
Watch verified HENGDE video from this customer project. Final equipment scope and project data remain specific to the published case record.