SMALL & MEDIUM LINES FIRST

Lightweight Block Production Lines by Capacity

Start with HENGDE's 30, 50, 100 and 200 m³/day configurations for small and medium factories. Higher-output project references remain available when the market and factory plan require them.

HENGDE lightweight block production equipment at the Cote d Ivoire customer project
REAL HENGDE BLOCK PROJECT
30–1000 m³/dayPublished block capacities
CLC / NAAC / SpecialProcess routes
BOM + LayoutConfiguration evidence

CHOOSE A CAPACITY

Small and medium block-production lines first

Compare 30, 50, 100 and 200 m³/day configurations first. Higher-output references follow without replacing the project-specific engineering review.

PROJECT DELIVERY / TURNKEY SUPPORT

From local materials to an operating factory

A factory proposal connects the project country, raw materials, target product and capacity, product dimensions, factory land, utilities, budget and automation requirement. The service and supply responsibilities are agreed for each project.

  1. 01

    Raw Material Testing

    Evaluate representative samples from the project location before selecting the final process.

  2. 02

    Formula Adjustment

    Adjust the formulation and material ratios against the test results and target product.

  3. 03

    Product & Process Selection

    Confirm product dimensions and the product-specific preparation, forming, curing and finishing process.

  4. 04

    Factory Layout Planning

    Coordinate land, buildings, storage, material flow, foundations and utilities.

  5. 05

    Production Line Customization

    Match capacity, automation, budget, moulds and process interfaces to the agreed factory scope.

  6. 06

    Equipment Manufacturing

    Prepare the agreed machines, tooling and controls against the approved configuration.

  7. 07

    Factory Acceptance

    Check applicable equipment and delivery scope before shipment.

  8. 08

    Packing & Shipping

    Coordinate packing, loading and destination requirements with the project shipping plan.

  9. 09

    Site Installation

    Install and connect the agreed equipment after site conditions are ready.

  10. 10

    Commissioning

    Check machine sequences and trial production with the selected materials.

  11. 11

    Operator Training

    Train operators in safe use, production sequence and routine maintenance.

  12. 12

    After-sales & Spare Parts

    Plan maintenance communication and spare-parts support for the installed equipment.

Not sure which capacity fits your factory?

Send your target block, project country, raw materials and planned output. HENGDE will use the complete project form to review the appropriate line direction.

Plan Your Factory
RAW MATERIAL ENGINEERING

Test local materials before final line configuration

HENGDE can evaluate locally available raw materials before finalizing the process and equipment configuration.

Start with representative samples

Review locally available materials against the target product before production equipment is selected.

Recycled or variable inputs require source-specific testing and trial production.

Adjust the process after testing

Test results guide material ratios, dosing, mixing, forming, curing and finishing requirements.

Final formulation and equipment follow the actual materials and required product.

WhatsAppDiscuss this page