Foundation and installation-line check
Foundation and installation-line check
Position, connect and check equipment in the order required by the production process.

Foundation and installation-line check
Mechanical positioning and alignment
Electrical and utility connection
Installation completion check
Required information, drawings, materials and site preparation are available.
The agreed project scope and actual site conditions have been reviewed for this stage.
HENGDE, customer and locally supplied items are clearly allocated.
The responsible parties understand what must be ready before the next stage starts.
Tell us what you plan to produce and where the factory will be built.
HENGDE can evaluate locally available raw materials before finalizing the process and equipment configuration.
Review locally available materials against the target product before production equipment is selected.
Recycled or variable inputs require source-specific testing and trial production.
Test results guide material ratios, dosing, mixing, forming, curing and finishing requirements.
Final formulation and equipment follow the actual materials and required product.