Packing and shipment list
Packing and shipment list
Coordinate packing, transport interfaces and the work the customer must complete before arrival.
Packing and shipment list
Foundation and embedded-item drawings
Power, water and access readiness
Arrival sequence and storage protection
Required information, drawings, materials or readiness evidence is recorded.
Checks are documented against the agreed project scope and actual site condition.
Unconfirmed, excluded and locally supplied items remain clearly visible.
The responsible parties understand what must be ready before the next stage starts.
Tell us the project country, target product, local raw materials, planned output and current project stage.

Engineering can only configure a practical line when the real production conditions are visible.