Material source and variability
Material source and variability
Test and document local inputs before the process and equipment scope are fixed.
Material source and variability
Basic physical and chemical test data
Trial formulation where the risk requires it
Decision record: suitable, conditional or not confirmed
Required information, drawings, materials or readiness evidence is recorded.
Checks are documented against the agreed project scope and actual site condition.
Unconfirmed, excluded and locally supplied items remain clearly visible.
The responsible parties understand what must be ready before the next stage starts.
Tell us the project country, target product, local raw materials, planned output and current project stage.

Engineering can only configure a practical line when the real production conditions are visible.