MOULD CIRCULATION & TRANSFER

Move moulds through pouring, curing, demoulding and return

The mould loop must be planned around curing time, mould quantity, rail layout, drive positions, cutting rhythm and safe factory movement.

Independent engineeringEquipment manufacturingProject delivery
COMPLETE MOULD-RETURN DRAWINGRail transfer, drive positions and return movement
Hengde mould return production line engineering drawing
HENGDEENGINEERED AS ONE SYSTEM
PourControlled mould entry
CurePlanned positions & time
ReturnConnected circulation loop
01
CIRCULATION LOOP

Design movement around the production sequence

01

Mould entry

Position clean, prepared moulds for the confirmed pouring rhythm.

02

Curing positions

Provide the quantity and movement logic required by the process.

03

Demoulding transfer

Move the billet safely toward peeling and cutting.

04

Return movement

Return moulds for cleaning, preparation and the next cycle.

Mould return line engineering drawing
Engineering drawing showing the connected mould movement direction.
02
FACTORY INTEGRATION

Rails, drives and layout must match the whole factory

01

Rail alignment

Foundation, straightness, level and safe clearances affect reliable movement.

02

Drive positions

Locate powered transfer around the approved sequence and access needs.

03

Cutting connection

Synchronize demoulding and billet delivery with the cutting section.

04

Future expansion

Reserve realistic space and utilities where later capacity growth is planned.

Installation team aligning production line rails and drive equipment
Real installation activity showing rail and drive alignment.
SEND YOUR PROJECT INFORMATION

Let engineering review the complete factory need

Tell us the project country, target product, local raw materials, planned output and current project stage.

Hengde mould return production line engineering drawing
Product, materials, capacity, factory and timeline

Project details help engineering review the product, process, output and factory need. This form uses Hengde's existing inquiry workflow.