SMALL & MEDIUM FACTORIES FIRST

Lightweight Block & Wall Panel Production Lines

Start with the small and medium configurations most suitable for staged investment, then compare higher-output project references when the market, materials and factory plan support them.

Connected HENGDE lightweight block production equipment at the Cote d Ivoire customer project
REAL HENGDE PROJECT EQUIPMENT
30–1000 m³/dayBlock production lines
80–500 m³/dayWall panel lines
Equipment + Layout + InstallationComplete project support

TWO PRODUCT FAMILIES

Choose What Your Factory Will Produce

The final equipment configuration follows the product family, planned output, raw materials, process and factory conditions.

SMALL & MEDIUM LINES FIRST

Compare published equipment configurations by capacity

Small and medium configurations are listed first. Every existing higher-output URL remains available as a secondary project reference.

SMALL / MEDIUM PRIORITY · BLOCK · 30 m³/day

30 m³/day CLC Block Production Line

HENGDE 30 cubic metre per day compact lightweight block production line engineering layoutENGINEERING LAYOUT

3.75 m³/hour planning reference · 8 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · BLOCK · 50 m³/day

50 m³/day CLC Block Production Line

50 cubic metre square-mould physical-foaming lightweight block line engineering layoutENGINEERING LAYOUT

6.25 m³/hour planning reference · 15 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · WALL PANEL · 80 m³/day

80 m³/day Lightweight Wall Panel Production Line

HENGDE lightweight wall panel production equipment assembled in the workshopENGINEERING LAYOUT

10 m³/hour planning reference · 31 equipment rows · Simplified configuration

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · BLOCK · 100 m³/day

100 m³/day CLC Block Production Line

100 cubic metre per day lightweight block production line engineering layoutENGINEERING LAYOUT

12.5 m³/hour planning reference · 24 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · WALL PANEL · 150 m³/day

150 m³/day Lightweight Wall Panel Production Line

HENGDE lightweight wall panel production equipment assembled in the workshopENGINEERING LAYOUT

18.75 m³/hour planning reference · 29 equipment rows · Standard configuration

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · BLOCK · 200 m³/day

200 m³/day CLC Block Production Line

200 cubic metre per day lightweight block production line engineering layoutENGINEERING LAYOUT

25 m³/hour planning reference · 25 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · WALL PANEL · 200 m³/day

200 m³/day Lightweight Wall Panel Production Line

HENGDE lightweight wall panel production equipment assembled in the workshopENGINEERING LAYOUT

25 m³/hour planning reference · 30 equipment rows · Standard configuration

Open layout and equipment table →
HIGHER-OUTPUT REFERENCE · BLOCK · 300 m³/day

300 m³/day CLC Block Production Line

300 cubic metre per day CLC block production line engineering layoutENGINEERING LAYOUT

37.5 m³/hour planning reference · 25 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
HIGHER-OUTPUT REFERENCE · BLOCK · 400 m³/day

400 m³/day CLC Block Production Line

400 cubic metre per day lightweight block production line engineering layoutENGINEERING LAYOUT

50 m³/hour planning reference · 26 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
HIGHER-OUTPUT REFERENCE · WALL PANEL · 500 m³/day

500 m³/day Lightweight Wall Panel Production Line

HENGDE 500 cubic metre wall-panel production line engineering layoutENGINEERING LAYOUT

62.5 m³/hour planning reference · 32 equipment rows · Chemical-reaction mixing configuration

Open layout and equipment table →
HIGHER-OUTPUT REFERENCE · BLOCK · 600 m³/day

600 m³/day CLC Block Production Line

HENGDE lightweight block production equipment assembly shown for the 600 cubic metre line scopeENGINEERING LAYOUT

75 m³/hour planning reference · 27 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
HIGHER-OUTPUT REFERENCE · BLOCK · 1000 m³/day

1000 m³/day CLC Block Production Line

HENGDE lightweight block production equipment assembly shown for the 1000 cubic metre line scopeENGINEERING LAYOUT

125 m³/hour planning reference · 31 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →

COMPATIBLE PRODUCTS & PROCESS OPTIONS

Product & Process Options

Lightweight block and wall-panel lines can be configured for different raw materials and production processes.

PROJECT DELIVERY / TURNKEY SUPPORT

From local materials to an operating factory

A factory proposal connects the project country, raw materials, target product and capacity, product dimensions, factory land, utilities, budget and automation requirement. The service and supply responsibilities are agreed for each project.

  1. 01

    Raw Material Testing

    Evaluate representative samples from the project location before selecting the final process.

  2. 02

    Formula Adjustment

    Adjust the formulation and material ratios against the test results and target product.

  3. 03

    Product & Process Selection

    Confirm product dimensions and the product-specific preparation, forming, curing and finishing process.

  4. 04

    Factory Layout Planning

    Coordinate land, buildings, storage, material flow, foundations and utilities.

  5. 05

    Production Line Customization

    Match capacity, automation, budget, moulds and process interfaces to the agreed factory scope.

  6. 06

    Equipment Manufacturing

    Prepare the agreed machines, tooling and controls against the approved configuration.

  7. 07

    Factory Acceptance

    Check applicable equipment and delivery scope before shipment.

  8. 08

    Packing & Shipping

    Coordinate packing, loading and destination requirements with the project shipping plan.

  9. 09

    Site Installation

    Install and connect the agreed equipment after site conditions are ready.

  10. 10

    Commissioning

    Check machine sequences and trial production with the selected materials.

  11. 11

    Operator Training

    Train operators in safe use, production sequence and routine maintenance.

  12. 12

    After-sales & Spare Parts

    Plan maintenance communication and spare-parts support for the installed equipment.

Plan the line around your product and factory

Send the target product, planned output, raw materials, factory location and preferred automation level. HENGDE will review the applicable process and equipment scope.

Plan Your Factory
RAW MATERIAL ENGINEERING

Test local materials before final line configuration

HENGDE can evaluate locally available raw materials before finalizing the process and equipment configuration.

Start with representative samples

Review locally available materials against the target product before production equipment is selected.

Recycled or variable inputs require source-specific testing and trial production.

Adjust the process after testing

Test results guide material ratios, dosing, mixing, forming, curing and finishing requirements.

Final formulation and equipment follow the actual materials and required product.