EXPANDED-CLAY ROUTE

Ceramsite lightweight product production line

Ceramsite grading, absorption and moisture must be tested before feeding, mixing, moulding and finishing are selected. HENGDE configures this route after reviewing the actual aggregate and target product.

SIX-STEP PROCESS

Six route-specific process stages

  1. 01

    Test aggregate

    Confirm ceramsite grading, absorption and moisture before configuration.

  2. 02

    Meter components

    Dose the confirmed aggregate, binder and water inputs.

  3. 03

    Mix & mould

    Select mixing and moulding around the tested project recipe.

  4. 04

    Cure & demould

    Match curing and release conditions to the target product.

  5. 05

    Cut & finish

    Use only the cutting or finishing scope confirmed for the project.

  6. 06

    Handle & store

    Confirm the handling and storage method for the selected product and site.

CONFIRMED EQUIPMENT SCOPE

Confirmed common equipment — remaining scope is project-specific

Final equipment is selected according to the target product, tested raw materials, required output and factory conditions.

PROJECT DELIVERY / TURNKEY SUPPORT

From local materials to an operating factory

A factory proposal connects the project country, raw materials, target product and capacity, product dimensions, factory land, utilities, budget and automation requirement. The service and supply responsibilities are agreed for each project.

  1. 01

    Raw Material Testing

    Evaluate representative samples from the project location before selecting the final process.

  2. 02

    Formula Adjustment

    Adjust the formulation and material ratios against the test results and target product.

  3. 03

    Product & Process Selection

    Confirm product dimensions and the product-specific preparation, forming, curing and finishing process.

  4. 04

    Factory Layout Planning

    Coordinate land, buildings, storage, material flow, foundations and utilities.

  5. 05

    Production Line Customization

    Match capacity, automation, budget, moulds and process interfaces to the agreed factory scope.

  6. 06

    Equipment Manufacturing

    Prepare the agreed machines, tooling and controls against the approved configuration.

  7. 07

    Factory Acceptance

    Check applicable equipment and delivery scope before shipment.

  8. 08

    Packing & Shipping

    Coordinate packing, loading and destination requirements with the project shipping plan.

  9. 09

    Site Installation

    Install and connect the agreed equipment after site conditions are ready.

  10. 10

    Commissioning

    Check machine sequences and trial production with the selected materials.

  11. 11

    Operator Training

    Train operators in safe use, production sequence and routine maintenance.

  12. 12

    After-sales & Spare Parts

    Plan maintenance communication and spare-parts support for the installed equipment.

Discuss this production route

Share your target product, required output and factory location for a suitable equipment proposal.

Discuss Your Project
RAW MATERIAL OPTIONS

Use Locally Available Raw Materials Where the Process Allows

Ceramsite products use expanded-clay lightweight aggregate with a compatible binder system. Aggregate grading and water absorption affect the final process configuration.

Test the ceramsite aggregate

Review expanded-clay grading, density, moisture, absorption and supply consistency with the selected binder system.

Representative samples are needed before feeding, metering, mixing and finished-product equipment are selected.

Adjust water and mixing to the aggregate

Testing determines pre-wetting needs, water demand, batch sequence, mixer operation, mould filling and curing conditions.

Cutting and handling are then selected for the verified product geometry and cured condition.

Ceramsite lightweight aggregate for wall-panel production

Ceramsite / Expanded Clay Aggregate

Typical role
Lightweight aggregate selected by grading, density and water absorption
Applicable route
Ceramsite lightweight products
Representative cementitious material for project formulation review

Cementitious Materials

Typical role
Project-specific binder system; exact materials and proportions require engineering confirmation
Applicable route
Ceramsite lightweight products

Sampling and project-specific review required.

Water metering for lightweight-product production

Water

Typical role
Mixing and process water subject to source-quality review
Applicable route
Ceramsite lightweight products
Mineral filler sample under project-specific material review

Project-Specific Mineral Fillers

Typical role
Optional fillers selected through project testing
Applicable route
Ceramsite lightweight products

Sampling and project-specific review required.

Project-specific additive evaluated during formulation testing

Project-Specific Additives

Typical role
Only additives confirmed for the specific project and material system
Applicable route
Ceramsite lightweight products

Sampling and project-specific review required.

LOCAL MATERIAL REVIEW

Send Your Local Material Information Before Final Line Configuration

Raw-material availability varies by country. Send HENGDE your local material information before the final production-line configuration is confirmed.

Evaluate My Local Raw Materials

Representative material photographs: cement, Szlomo Lejb / Sumek101; expanded clay, Lucis. Licensed under applicable CC BY-SA / GFDL terms. HENGDE project and testing photographs are identified separately.

WhatsAppDiscuss this page