PROJECT CASE

Cambodia 100 m³/day foam-concrete block production line

The supplied Cambodia project record identifies a lightweight foam-concrete block line and includes real site media for mixing, mould handling and block cutting on a 100 m³/day project basis. The images are presented only for the production functions they visibly document.

Independent engineeringEquipment manufacturingProject delivery
REAL CAMBODIA SITE MEDIACutting equipment documented at the customer production site
Foam-concrete lightweight block cutting equipment at the Cambodia project site
LUCA SMARTENGINEERED AS ONE SYSTEM
100 m³/dayProject design basis
Foam-concrete blocksTarget product
Phnom PenhProject location
01
PROCESS EVIDENCE

Site media across three production functions

Material feeding and mixing system at the Cambodia foam-concrete block project site REAL MIXING EQUIPMENT
01

Mixing and feeding

The site image records the installed material and mixing equipment for this project.

Moulded lightweight block material entering the cutting route in Cambodia REAL PROJECT-SITE PHOTO
02

Mould and transfer route

The cutting-line view shows moulded material entering the downstream production section.

Foam-concrete lightweight block cutting equipment operating at the Cambodia site REAL CUTTING EQUIPMENT
03

Block cutting

Separate media shows the cutting section working with the customer-site production route.

02
PROJECT BASIS

Capacity remains tied to the agreed product and factory

The 100 m³/day figure is the documented design basis for this project. Actual production depends on local materials, product sizes, curing, cutting rhythm, shifts and operating control.

PROJECT FACTS

Confirmed scope and record boundaries

Country / region
Phnom Penh, Cambodia
Product
Foam-concrete lightweight blocks
Design capacity
100 m³/day project basis
Verified stage
Production-site media documented
Record date
May 2026

Equipment or functions confirmed by the public record

  • Mixing and feeding
  • Mould and transfer route
  • Block cutting

Unconfirmed scope

Commercial scope beyond the photographed or dated record is not confirmed. Installation, commissioning and commercial production are not implied unless named as the verified stage.

PROJECT TIMELINE

Milestones supported by the available record

  1. Production-site media documented
  2. Earlier commercial milestones are not stated in the public record
NEXT STEP

Start with your product, materials and project location

Engineering can only configure a practical line when the real production conditions are visible.

Request an initial line review