Tirana, Albania Albania 100 m³/day foam-concrete block production line
- Product
- Foam-concrete blocks
- Capacity
- 100 m³/day project basis
- Project Stage
- Line operating at site
PHYSICAL-FOAMING CLC ROUTE
A complete CLC route connects material metering, physical foam preparation, mixing, moulding, non-autoclaved curing, cutting and handling.
Open original imageSIX-STEP PROCESS
Feed and weigh the confirmed powders, aggregate and water.
Prepare the physical foam and add it through the approved batch sequence.
Pour the mixed slurry into the confirmed block mould.
Hold the moulded material under the project curing conditions.
Use the cutting architecture confirmed for the selected capacity.
Move finished blocks through the confirmed handling scope.
PRODUCTION LINE GALLERY
Drag or swipe through real equipment photos and engineering layouts. Open the main image to inspect it at full size.
CONFIRMED EQUIPMENT SCOPE
Moves compatible powder materials from storage toward the metering section.
View device detail → Preparation & meteringMeasures the confirmed powder input for each production batch.
View device detail → Preparation & meteringStores and releases the confirmed water quantity for the controlled batch.
View device detail → Physical foaming & mixingPrepares physical foam for a confirmed CLC foam-concrete route; it is not an aluminium-powder NAAC machine.
View device detail → Physical foaming & mixingCombines the confirmed solids, water and route-specific lightweight constituent according to the approved batch sequence.
View device detail → PLC, electrical & toolingCoordinates the confirmed line sequence, interlocks, commands and alarms.
View device detail →PROJECT DELIVERY / TURNKEY SUPPORT
A factory proposal connects the project country, raw materials, target product and capacity, product dimensions, factory land, utilities, budget and automation requirement. The service and supply responsibilities are agreed for each project.
Evaluate representative samples from the project location before selecting the final process.
Adjust the formulation and material ratios against the test results and target product.
Confirm product dimensions and the product-specific preparation, forming, curing and finishing process.
Coordinate land, buildings, storage, material flow, foundations and utilities.
Match capacity, automation, budget, moulds and process interfaces to the agreed factory scope.
Prepare the agreed machines, tooling and controls against the approved configuration.
Check applicable equipment and delivery scope before shipment.
Coordinate packing, loading and destination requirements with the project shipping plan.
Install and connect the agreed equipment after site conditions are ready.
Check machine sequences and trial production with the selected materials.
Train operators in safe use, production sequence and routine maintenance.
Plan maintenance communication and spare-parts support for the installed equipment.
Share your target product, required output and factory location for a suitable equipment proposal.
CLC physical foaming combines a tested cementitious and mineral slurry with controlled preformed foam. Materials are not automatically interchangeable.
Review the available binder, mineral input, process water and physical-foaming input against the target CLC block.
Recycled mineral inputs require source-specific sorting, sampling and trial production before they enter the line design.
Test results guide slurry proportions, water ratio, preformed-foam dosage, mixing sequence and mould filling.
The confirmed curing, demoulding and cutting condition then determines mould circulation and downstream handling.
Sampling and project-specific review required.
Sampling and project-specific review required.
Sampling and project-specific review required.
Sampling and project-specific review required.
A planned collection and settling loop can reduce uncontrolled slurry discharge and recover process water. The exact civil works, pump selection and reuse rate depend on the project layout and tested material system.
Raw-material availability varies by country. Send HENGDE your local material information before the final production-line configuration is confirmed.
Representative material photographs: cement, Szlomo Lejb / Sumek101; river sand, Krzem Anonim; fly ash, Ablazejo. Licensed under applicable CC BY-SA / GFDL terms. HENGDE project and testing photographs are identified separately.