Approved equipment and drawing register
Approved equipment and drawing register
Build the confirmed equipment scope and record the checks completed before dispatch.
Approved equipment and drawing register
Manufacturing and assembly checks
Factory acceptance test plan
Open-item and release record
Required information, drawings, materials or readiness evidence is recorded.
Checks are documented against the agreed project scope and actual site condition.
Unconfirmed, excluded and locally supplied items remain clearly visible.
The responsible parties understand what must be ready before the next stage starts.
Tell us the project country, target product, local raw materials, planned output and current project stage.

Engineering can only configure a practical line when the real production conditions are visible.