REAL PROJECT-SITE PHOTO Connected factory line
The elevated site view records the installed transfer, cutting and handling areas inside the Xianning factory.
The Xianning project record covers a combined lightweight block and partition-wall-panel line. The contract was signed in July 2024, equipment reached final installation and commissioning at the end of December, and the supplied record identifies February 2025 as the production-start milestone.
REAL PROJECT-SITE PHOTO The elevated site view records the installed transfer, cutting and handling areas inside the Xianning factory.
REAL CUTTING EQUIPMENT Separate project media shows moulded lightweight material entering the cutting equipment.
REAL FINISHED PRODUCT The same project file includes finished partition wall panels in the downstream handling area.
The source record identifies 500 m³/day for blocks and 200 m³/day for partition wall panels as the project basis. Actual output depends on the product mix, materials, curing, mould cycle, shifts and operating conditions.
Commercial scope beyond the photographed or dated record is not confirmed. Installation, commissioning and commercial production are not implied unless named as the verified stage.
Engineering can only configure a practical line when the real production conditions are visible.