REAL PROJECT-SITE PHOTO Connected production line
The project overview records cutting, transfer and downstream handling equipment inside the Ordos factory.
The Ordos project file identifies a 300 m³/day design basis for non-autoclaved aerated concrete blocks and includes real site media for the connected line, mould handling and finished blocks. The stated basis remains project-specific.
REAL PROJECT-SITE PHOTO The project overview records cutting, transfer and downstream handling equipment inside the Ordos factory.
REAL MOULDING PROCESS Separate site media shows moulded lightweight material within the connected handling route.
REAL FINISHED PRODUCT The same project file includes finished NAAC blocks in the downstream equipment area.
Actual daily production depends on confirmed raw materials, block dimensions, curing, cutting rhythm, shifts and operating management. No blanket performance guarantee is inferred from the project images.
Commercial scope beyond the photographed or dated record is not confirmed. Installation, commissioning and commercial production are not implied unless named as the verified stage.
Engineering can only configure a practical line when the real production conditions are visible.