PROJECT CASE

Tacheng 100 m³/day self-insulating block cutting upgrade

The Tacheng project file records an upgrade from an older vertical cutting process. Real project media documents equipment loading, product measurement and finished self-insulating blocks without treating the stated cutting performance as a blanket guarantee.

Independent engineeringEquipment manufacturingProject delivery
REAL TACHENG PROJECT MEDIAequipment and product media from the Tacheng cutting-system upgrade
Cut self-insulating block being measured during the Tacheng upgrade record
HENGDEProject-specific configuration
TachengProject location
100 m³/dayProject-file basis
Cutting upgradeConfirmed scope
01
CUTTING UPGRADE

Shipment, measurement and finished-product records

Cutting-upgrade equipment being loaded for the Tacheng project REAL LOADING PHOTO
01

Equipment loading

The supplied file includes the cutting-upgrade equipment being loaded for delivery.

Cut self-insulating block being measured during the Tacheng upgrade record REAL PRODUCT-CHECK PHOTO
02

Product measurement

A site image documents a cut self-insulating block being measured during the upgrade record.

Finished self-insulating blocks after the Tacheng cutting-system upgrade REAL FINISHED-PRODUCT PHOTO
03

Finished blocks

The project file includes finished self-insulating blocks after cutting at the customer site.

02
PERFORMANCE BOUNDARY

Cutting results depend on the actual product and line

Product density, moisture, dimensions, upstream handling and operating settings must be reviewed before any accuracy or throughput commitment.

PROJECT FACTS

Project location, product and delivery stage

Country / region
Tacheng, Xinjiang, China
Product
Self-insulating blocks
Design capacity
100 m³/day project basis
Project stage
Cutting-system upgrade
Published date
Jul 2025

Equipment and functions shown for this project

  • Equipment loading
  • Product measurement
  • Finished blocks
PROJECT TIMELINE

Published project milestones

  1. Cutting-system upgrade
PROJECT PHOTOS

Real photos from this customer project

Factory, equipment, installation and production images from this customer project.

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project

HENGDE VIDEO

Project Video

Retrofitting of self-insulating block equipment for a client in Tacheng

Watch verified HENGDE video from this customer project. Final equipment scope and project data remain specific to the published case record.

More Project Videos

WhatsAppDiscuss this page