Get a factory proposal
Tell us the target product, project location, available materials and planned capacity. Hengde will use these inputs to prepare the right production-line questions and direction.
01 · COMPLETE INPUTSProduct, materials, output and site status stay together.
02 · SOURCE RECORDEDPage and campaign source remain attached to the lead.
03 · TECHNICAL FOLLOW-UPEngineering receives one structured project brief.
