REAL PRE-DELIVERY PHOTO Equipment preparation
The project record shows production equipment prepared before delivery to the customer factory.
The March 2026 Lanzhou project file records a homogeneous composite self-insulating block line using a CLC foaming route. Equipment manufacturing and factory testing were completed before dispatch; installation and production are not claimed as completed.
REAL PRE-DELIVERY PHOTO The project record shows production equipment prepared before delivery to the customer factory.
REAL FACTORY-TEST PHOTO A separate factory image documents the cutting system during the pre-delivery record.
REAL PRODUCT-TEST PHOTO The factory-test record includes a cut self-insulating block at the equipment output.
The supplied record confirms manufacturing, factory testing and dispatch. Site installation, commissioning, training and production require later confirmed media.
Factory, equipment, installation and production images from this customer project.
Tell us what you plan to produce and where the factory will be built.
HENGDE VIDEO
Watch verified HENGDE video from this customer project. Final equipment scope and project data remain specific to the published case record.