PROJECT CASE

Ordos 300 m³/day NAAC block production line

The Ordos project file identifies a 300 m³/day design basis for non-autoclaved aerated concrete blocks and includes real site media for the connected line, mould handling and finished blocks. The stated basis remains project-specific.

Independent engineeringEquipment manufacturingProject delivery
REAL ORDOS PROJECT MEDIAConnected line equipment and finished blocks from the documented Ordos project
Finished NAAC blocks in the handling section of the Ordos production line
LUCA SMARTENGINEERED AS ONE SYSTEM
300 m³/dayProject design basis
NAAC blocksTarget product
OrdosProject location
01
PROJECT-SITE EVIDENCE

Connected equipment, mould handling and finished blocks

Connected NAAC block production equipment at the Ordos project site REAL PROJECT-SITE PHOTO
01

Connected production line

The project overview records cutting, transfer and downstream handling equipment inside the Ordos factory.

Moulded NAAC block material in the handling section of the Ordos production line REAL MOULDING PROCESS
02

Mould handling

Separate site media shows moulded lightweight material within the connected handling route.

Finished NAAC blocks at the Ordos project site REAL FINISHED PRODUCT
03

Finished blocks

The same project file includes finished NAAC blocks in the downstream equipment area.

02
CAPACITY BASIS

The 300 m³/day value belongs to this project record

Actual daily production depends on confirmed raw materials, block dimensions, curing, cutting rhythm, shifts and operating management. No blanket performance guarantee is inferred from the project images.

PROJECT FACTS

Confirmed scope and record boundaries

Country / region
Ordos, Inner Mongolia, China
Product
NAAC lightweight blocks
Design capacity
300 m³/day project basis
Verified stage
Production record available
Record date
Sep 2025

Equipment or functions confirmed by the public record

  • Connected production line
  • Mould handling
  • Finished blocks

Unconfirmed scope

Commercial scope beyond the photographed or dated record is not confirmed. Installation, commissioning and commercial production are not implied unless named as the verified stage.

PROJECT TIMELINE

Milestones supported by the available record

  1. Production record available
  2. Earlier commercial milestones are not stated in the public record
NEXT STEP

Start with your product, materials and project location

Engineering can only configure a practical line when the real production conditions are visible.

Request an initial line review