REAL SITE-PREPARATION PHOTO Foundation and site preparation
The project file records floor and foundation work inside the customer factory before the connected route was completed.
The supplied site file documents a lightweight-block production line during installation and equipment testing. It shows foundation preparation, feeding-platform work, cutting equipment and downstream handling. The record does not by itself establish final acceptance or stable commercial output.
REAL SITE-PREPARATION PHOTO The project file records floor and foundation work inside the customer factory before the connected route was completed.
REAL INSTALLATION PHOTO A separate image documents the feeding platform and material vessels positioned in the production area.
REAL EQUIPMENT-TEST PHOTO The site record shows lightweight blocks at the cutting equipment during an equipment-test stage.
REAL INSTALLATION PHOTO Downstream stacking and handling equipment is shown being positioned along the project transfer rails.
The available media proves site preparation, equipment installation and a visible test stage. Final commissioning acceptance, operating capacity and stable commercial production require separate confirmed records.
Factory, equipment, installation and production images from this customer project.
Tell us what you plan to produce and where the factory will be built.
HENGDE VIDEO
Watch verified HENGDE video from this customer project. Final equipment scope and project data remain specific to the published case record.