Libya Project Team Reviews HENGDE Lightweight Block Production Line
On October 29, 2025, a project team linked to the project visited HENGDE to review EPS lightweight block production equipment and discuss how the project could be configured for local conditions. The discussion focused on EPS lightweight block production, equipment selection and the practical conditions needed for a stable project.

On October 29, 2025, a project team linked to the project visited HENGDE to review EPS lightweight block production equipment and discuss how the project could be configured for local conditions.
Project Focus
The discussion focused on EPS lightweight block production, equipment selection and the practical conditions needed for a stable project.
The technical discussion covered local raw-material suitability and process adjustment, EPS lightweight-product processing and material dosing, and target output, mould cycle and equipment capacity planning.
What Happens Next
Rather than treating the visit as a showroom tour, the discussion was tied to the customer’s actual project: what needs to be produced, which raw materials are available, how the equipment should be arranged and what support will be needed after delivery.
The source record also notes 100 m³.
The next step is to refine the production-line configuration around the confirmed product specifications, target output, factory conditions and implementation schedule.

Planning a similar lightweight block or wall-panel project? Tell us your project country, target product and planned output.
REAL PHOTO GALLERY
Published project and event references



