Indonesian Customer Visits HENGDE to Review Lightweight Block Production Equipment
On August 26, 2026, an Indonesian customer visited Guangzhou Hengde Construction Technology Co., Ltd. to review lightweight block production equipment, the complete production process and the approach used to prepare overseas projects.

Project at a glance
- Project Country
- Indonesia
- Product
- Lightweight blocks
- Process Route
- Raw-material storage and metering; mixing and foaming; casting and moulding; curing and demoulding; finished-product handling
- Project Stage
- Factory Review
Reviewing the Complete Production Process
Project Background
The visit began with an engineering discussion in the meeting room. Using production-flow drawings, equipment-layout information and previous project references, the HENGDE team explained the main stages of lightweight block production.
The discussion covered raw-material storage and metering, mixing and foaming, casting and moulding, curing and demoulding, and finished-product handling. This gave the customer a clear overview of how the equipment works together as a complete line.
Why Each Overseas Factory Requires Its Own Configuration
Customer Review Focus
The team also explained the planning principles used for overseas factories. Projects producing the same type of lightweight block can still require different equipment quantities, automation levels and workshop layouts.
The final configuration must be based on the available raw materials, required product specifications, target output, site area, power supply and local labour conditions. Equipment selection therefore cannot be based only on the price of individual machines or copied directly from another project.
From Line Drawings to Workshop Equipment
Questions and Next Decision
After the meeting, the customer entered the HENGDE workshop to view equipment under manufacture and assembly. The HENGDE team explained the role of each production section, how adjacent machines connect and which site and foundation conditions should be prepared before installation.
Moving from engineering drawings to physical equipment helped the customer understand which machines are required, how the line operates as a coordinated system and what information must be prepared before developing an overseas factory.
Next Step for the Indonesia Project
Next Step for the Indonesia Project
The current project stage is Factory Review and solution assessment. The next step is to verify the Indonesian project’s raw materials, product specifications, target output and site conditions before confirming the equipment scope and production-line configuration.
REAL PHOTO GALLERY
Published project and event references



Planning a similar lightweight block production project?
Share your product, project location, target output and available materials with the HENGDE team.
Get a Production Line Proposal

