200 m³/DAY REFERENCE CONFIGURATION

200 m³/day wall-panel and lightweight-block line

This high-output physical-foaming reference scope connects preparation, metering, mixing, mould circulation, horizontal and vertical cutting, slotting, handling and centralized control. Final output and equipment follow the confirmed product, materials, shifts and factory.

Independent engineeringEquipment manufacturingProject delivery
REAL HENGDE FACTORY EQUIPMENTConnected production modules prepared around a confirmed project scope.
Connected Hengde lightweight wall-material production equipment assembled in the factory
HENGDEENGINEERED AS ONE SYSTEM
200 m³/dayReference production direction
≈280 kWRounded listed connected power
70 setsMould quantity in reference list
01
VERIFIED REFERENCE SCOPE

Use the equipment list to understand the complete line

The uploaded reference list contains 36 named equipment and tooling items across preparation, cutting, finishing, circulation and electrical control. It is a planning reference, not a universal quotation: final quantities, installed power and output must be recalculated for the project.

01

Preparation & metering

Two screw feeders, belt conveyor, powder metering, conveyor-linked metering and water metering.

02

Foaming & mixing

Physical foaming machine, screw air compressor, operating platform, extra-large horizontal mixer, premixer and powered storage bin.

03

Cutting & finishing

Nine-station horizontal saw, twin-mould three-station CNC vertical saw, peeling, slotting, demoulding and turning equipment.

04

Circulation & control

Transfer cars, pouring, demoulding and mould-return lines, twin cutting drives, PLC master cabinet and distributed electrical cabinets.

Engineering drawing of the nine-station horizontal cutting section listed for the 200 cubic metre reference line
Engineering drawing — the listed nine-station horizontal cutting section, not a project photograph.
02
BATCH PREPARATION

Metering, physical foaming and mixing set the production rhythm

Belt conveyor engineering drawing for the listed preparation section ENGINEERING DRAWING
01

Belt conveying

Reference model HDPDA-001 connects material feeding to the preparation section.

Read more
Water metering system engineering drawing for controlled batch input ENGINEERING DRAWING
02

Water metering

A dedicated water-metering unit controls the confirmed batch input.

Read more
Hengde physical foaming machine for the confirmed foam-concrete process REAL EQUIPMENT PHOTO
03

Physical foaming

Reference model HDKWF1-001 prepares foam for the confirmed physical-foaming process.

Read more
04

Mixing & transfer

The list connects an extra-large horizontal mixer, premixer, powered storage bin and project-selected slurry transfer.

03
CUTTING & FINISHING

Horizontal cutting, vertical cutting and finishing are separate jobs

Nine-station horizontal cutting saw engineering drawing ENGINEERING DRAWING
01

Nine-station horizontal saw

Reference model HDSQ-009 is listed as the main multi-station horizontal cutting section.

Read more
02

Twin-mould CNC vertical saw

A three-station vertical cutting section is listed to connect the required second cutting direction.

Hengde automatic slotting machine assembled inside the factory REAL FACTORY PHOTO
03

Automatic slotting

Multi-panel slotting is listed for the confirmed groove or joint profile.

Read more
Hengde wall-panel and block clamping system in the factory REAL FACTORY PHOTO
04

Clamping & handling

A wall-panel and block clamp, demoulding tool and turning equipment move the product through finishing.

Read more
04
CIRCULATION & TOOLING

Mould quantity and transfer equipment support the nominal output

01

Seven transfer cars

The reference list includes seven wall-panel transfer cars with corresponding electrical cabinets.

02

Three line stages

One pouring line, one demoulding line and one mould-return line are listed, plus two cutting-drive lines.

03

Mould system

The reference tooling scope lists 70 mould sets, 30 mould bases and 20 receiving plates.

04

Insert system

Rod frames, racks, rods and transfer carts are included for the confirmed panel-production route.

Hengde mould return line engineering drawing for the 200 cubic metre reference configuration
Engineering drawing for mould circulation; final rail length and positions follow the approved layout.
05
ELECTRICAL SCOPE

Treat listed connected power as a design input, not an operating-cost promise

The source list rounds total connected power to approximately 280 kW. The arithmetic sum of the listed powered items is about 280.65 kW; actual installed scope, simultaneous demand, operating load and local electrical design require project confirmation.

Hengde PLC main control cabinet for a connected lightweight wall-material line
Original equipment photo — PLC and remote functions depend on the delivered electrical scope.
BUYER QUESTIONS

Questions to answer before equipment selection

Does 200 m³/day mean every project will produce exactly 200 m³?+

No. It is a reference direction. Product geometry, recipe, curing, mould cycle, shifts, cutting rhythm, labour and factory conditions determine practical output.

Is every listed machine mandatory?+

No. The reference list explains one high-output route. Final equipment and quantities follow the confirmed product, automation level, site and contract.

Can the same direction cover blocks and wall panels?+

The uploaded list contains both block-line and wall-panel-specific modules. Engineering must confirm which products, moulds, cutting and finishing functions are included in the final project.

SEND YOUR PROJECT INFORMATION

Let engineering review the complete factory need

Tell us the project country, target product, local raw materials, planned output and current project stage.

Connected Hengde lightweight wall-material production equipment assembled in the factory
Product, materials, capacity, factory and timeline

Project details help engineering review the product, process, output and factory need. This form uses Hengde's existing inquiry workflow.

NEXT STEP

Start with your product, materials and project location

Engineering can only configure a practical line when the real production conditions are visible.

Prepare your project brief