PROJECT CASE

Aksu 100 m³/day simplified self-insulating block retrofit

This Aksu record is separate from the six-metre AAC-line retrofit. The project file describes a simplified 100 m³/day self-insulating block configuration with selected automation modules omitted to reduce initial investment.

Independent engineeringEquipment manufacturingProject delivery
REAL AKSU RETROFIT MEDIAA separate simplified-line record from the Aksu customer site
Mould preparation during the simplified Aksu self-insulating block retrofit
HENGDEProject-specific configuration
AksuProject location
100 m³/dayProject-file basis
Simplified retrofitConfirmed scope
01
RETROFIT AT SITE

Mould preparation and the simplified circulation route

Mould-rail operation during the simplified Aksu retrofit project REAL RETROFIT-SITE PHOTO
01

Mould-rail operation

The project file documents mould movement along the existing customer-factory rail route.

Mould preparation during the simplified Aksu self-insulating block retrofit REAL PROCESS PHOTO
02

Mould preparation

A separate image records material and mould preparation within the simplified configuration.

Mould circulation line at the simplified Aksu retrofit project site REAL LINE PHOTO
03

Mould circulation line

The customer-site media shows the mould line and existing factory rails used by the retrofit.

02
SCOPE BOUNDARY

A simplified configuration is project-specific

The omitted automation modules and retained equipment must be confirmed for each factory; this record is not a standard package or fixed quotation.

PROJECT FACTS

Project location, product and delivery stage

Country / region
Aksu, Xinjiang, China
Product
Self-insulating blocks
Design capacity
100 m³/day project basis
Project stage
Simplified-line retrofit
Published date
Jun 2025

Equipment and functions shown for this project

  • Mould-rail operation
  • Mould preparation
  • Mould circulation line
PROJECT TIMELINE

Published project milestones

  1. Simplified-line retrofit
PROJECT PHOTOS

Real photos from this customer project

Factory, equipment, installation and production images from this customer project.

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project

HENGDE VIDEO

Project Video

Case Study: Retrofitting Self-Insulating Block Equipment for an Aksu Client (Simplified Version)

Watch verified HENGDE video from this customer project. Final equipment scope and project data remain specific to the published case record.

WhatsAppDiscuss this page