TRAINING

Uzbekistan Project Team Trains on HENGDE CLC Block Production Equipment

An Uzbekistan project team visited HENGDE on January 6, 2026 for hands-on training on CLC / foamed-concrete block production equipment. The training followed the actual production flow, starting with feeding, metering, foaming and mixing before moving through casting, process connections and the key operating points that affect stable production.

Published
Updated
Author
HENGDE
Uzbekistan project team training on HENGDE clc / foamed concrete block production equipment
REAL EVENT / PROJECT REFERENCE

An Uzbekistan project team visited HENGDE on January 6, 2026 for hands-on training on CLC / foamed-concrete block production equipment.

Training Focus

The training followed the actual production flow, starting with feeding, metering, foaming and mixing before moving through casting, process connections and the key operating points that affect stable production.

HENGDE engineers worked beside the equipment so the customer could understand the operating logic and common checks rather than simply watch a demonstration. The customer also discussed how the process would need to be organised at its own factory.

Preparing for Site Production

After the equipment reaches site, HENGDE will support installation and commissioning and repeat the training under real production conditions so the customer’s team can move from basic operation to stable output.

Planning a similar lightweight block or wall-panel project? Tell us your project country, target product and planned output.

Discuss Your Project

PROJECT NEXT STEP

Apply the operation and maintenance plan

Confirm operator responsibilities, routine checks, maintenance records and follow-up technical questions.

View related production lines

More from HENGDE

View all news
WhatsAppDiscuss this page