HENGDE hosted a project team connected with Fujian on November 5, 2025 to review a proposed solid-waste lightweight material project. The discussion focused on a China-based solid-waste lightweight material project and the equipment, process and factory conditions needed for stable production.

HENGDE hosted a project team connected with Fujian on November 5, 2025 to review a proposed solid-waste lightweight material project.
Project Focus
The discussion focused on a China-based solid-waste lightweight material project and the equipment, process and factory conditions needed for stable production.
The technical discussion covered local industrial by-products and solid-waste raw-material utilization, local raw-material suitability and process adjustment, foaming, mixing and stable green-body formation, and target output, mould cycle and equipment capacity planning.
What Happens Next
During the factory visit, the customer was able to see how the relevant equipment is manufactured and how the main production stages connect. Questions were handled around the real project rather than a fixed one-size-fits-all line.
The project can now move into more detailed configuration once the customer confirms the final product, output target and site requirements.