Thailand Project Team Reviews Upgrade Options for an Existing Block Project
On February 10, 2026, a project team linked to Thailand visited HENGDE to review lightweight block production equipment and discuss how the project could be configured for local conditions. The project is intended for Thailand, with the discussion centred on lightweight block production and the practical conditions required to bring the line into operation.

On February 10, 2026, a project team linked to Thailand visited HENGDE to review lightweight block production equipment and discuss how the project could be configured for local conditions.
Project Focus
The project is intended for Thailand, with the discussion centred on lightweight block production and the practical conditions required to bring the line into operation.
The technical discussion covered local raw-material suitability and process adjustment, retrofitting the existing plant while retaining usable equipment, factory layout, site conditions and installation planning, and target output, mould cycle and equipment capacity planning.
What Happens Next
Rather than treating the visit as a showroom tour, the discussion was tied to the customer’s actual project: what needs to be produced, which raw materials are available, how the equipment should be arranged and what support will be needed after delivery.
The next step is to refine the production-line configuration around the confirmed product specifications, target output, factory conditions and implementation schedule.
Planning a similar lightweight block or wall-panel project? Tell us your project country, target product and planned output.