Albania 100 m³/day foam-concrete block production line

The Albania project file records a 100 m³/day production basis with installed mixing, transfer and cutting equipment. Project-site media is used here instead of generic factory photographs.

Independent engineeringEquipment manufacturingProject delivery
REAL ALBANIA SITE MEDIAInstalled equipment shown within the customer-site production route
Foam-concrete block cutting line at the Albania project site
LUCA SMARTENGINEERED AS ONE SYSTEM
100 m³/dayProject design basis
Foam concreteTarget block
TiranaProject location
01
PROJECT EQUIPMENT

Three documented parts of the site route

Mixing and material-transfer system at the Albania project site REAL MIXING EQUIPMENT
01

Mixing system

The project image shows the installed mixing and material-transfer equipment.

Installed foam-concrete block cutting line in Albania REAL CUTTING EQUIPMENT
02

Cutting line

The cutting equipment is shown in the customer-site environment with the connected transfer rails.

Customer-site foam-concrete production equipment in Albania REAL PROJECT-SITE PHOTO
03

Production area

The operating area documents the equipment arrangement and local site condition.

02
OPERATING CONTEXT

Output follows the confirmed operating conditions

The 100 m³/day figure is the project design basis. Product mix, raw materials, mould cycle, curing, shifts and operator practice determine the actual daily result.

PROJECT FACTS

Confirmed scope and record boundaries

Country / region
Tirana, Albania
Product
Foam-concrete blocks
Design capacity
100 m³/day project basis
Verified stage
Operating-site record available
Record date
Nov 2025

Equipment or functions confirmed by the public record

  • Mixing system
  • Cutting line
  • Production area

Unconfirmed scope

Commercial scope beyond the photographed or dated record is not confirmed. Installation, commissioning and commercial production are not implied unless named as the verified stage.

PROJECT TIMELINE

Milestones supported by the available record

  1. Operating-site record available
  2. Earlier commercial milestones are not stated in the public record