Johannesburg, South Africa South Africa 200 m³/day EPS self-insulating block line
- Product
- EPS self-insulating blocks
- Capacity
- 200 m³/day project basis
- Project Stage
- Production media available
EPS PRODUCT ROUTE
EPS storage and dosing, gentle mixing, moulding, curing and finishing are configured around the confirmed block or panel product.
Open original imageSIX-STEP PROCESS
Verify EPS particles, mineral inputs and the target product specification.
Dose only the components and proportions confirmed for the project.
Use the project mixing sequence and pour into the confirmed mould.
Match curing and demoulding to the product density and strength target.
Use only the finishing equipment confirmed for the selected EPS product.
Transfer finished products through the approved handling route.
PRODUCTION LINE GALLERY
Drag or swipe through real equipment photos and engineering layouts. Open the main image to inspect it at full size.
CONFIRMED EQUIPMENT SCOPE
Measures the confirmed powder input for each production batch.
View device detail → Preparation & meteringStores and releases the confirmed water quantity for the controlled batch.
View device detail → EPS material mixingCombines the confirmed solids, water and route-specific lightweight constituent according to the approved batch sequence.
View device detail → PLC, electrical & toolingForms the listed panel or block billet; final geometry follows the confirmed product.
View device detail → PLC, electrical & toolingCoordinates the confirmed line sequence, interlocks, commands and alarms.
View device detail →PROJECT DELIVERY / TURNKEY SUPPORT
A factory proposal connects the project country, raw materials, target product and capacity, product dimensions, factory land, utilities, budget and automation requirement. The service and supply responsibilities are agreed for each project.
Evaluate representative samples from the project location before selecting the final process.
Adjust the formulation and material ratios against the test results and target product.
Confirm product dimensions and the product-specific preparation, forming, curing and finishing process.
Coordinate land, buildings, storage, material flow, foundations and utilities.
Match capacity, automation, budget, moulds and process interfaces to the agreed factory scope.
Prepare the agreed machines, tooling and controls against the approved configuration.
Check applicable equipment and delivery scope before shipment.
Coordinate packing, loading and destination requirements with the project shipping plan.
Install and connect the agreed equipment after site conditions are ready.
Check machine sequences and trial production with the selected materials.
Train operators in safe use, production sequence and routine maintenance.
Plan maintenance communication and spare-parts support for the installed equipment.
Open original imageShare your target product, required output and factory location for a suitable equipment proposal.
EPS lightweight products combine a cementitious matrix with EPS granules and a suitable tested mineral aggregate. Additives remain project-specific.
Review EPS particle grade and density with the selected cementitious matrix, mineral input, process water and project additives.
Representative samples are needed to confirm particle distribution, fresh-mix behaviour and finished-product targets.
Testing determines EPS dosing, material sequence, mixer operation, mould filling and curing conditions for the selected block or panel.
Cutting and handling are then selected for the verified product geometry and cured condition.
Sampling and project-specific review required.
Sampling and project-specific review required.
Sampling and project-specific review required.
A planned collection and settling loop can reduce uncontrolled slurry discharge and recover process water. The exact civil works, pump selection and reuse rate depend on the project layout and tested material system.
Raw-material availability varies by country. Send HENGDE your local material information before the final production-line configuration is confirmed.