Project location
Country and customer market for the published project.
Explore HENGDE lightweight block, wall-panel, production-line and equipment-upgrade projects across different markets.

Browse project photos, products, locations and delivery stages. Capacity is shown only where it has been confirmed for publication.
REAL INDONESIA SHIPMENT MEDIA The project moved from a factory visit and contract signing in April to equipment loading on 7 July 2026.
REAL MONGOLIA SITE MEDIA Project photos show connected cutting and wall-panel grooving equipment at the customer site.
REAL SOUTH AFRICA PRODUCTION MEDIA This 200 m³/day project shows mould circulation, cutting and finished EPS lightweight blocks at the customer site.
REAL ALBANIA SITE MEDIA The project includes installation, operator support and operating-site equipment for a 100 m³/day foam-concrete block line.
REAL CAMBODIA SITE MEDIA This 100 m³/day lightweight foam-concrete block line includes mixing, mould handling and block cutting at the customer site.
REAL KYRGYZSTAN SITE MEDIA The Bishkek project shows cutting equipment, moulds and finished blocks for a planned 100–200 m³/day production range.
REAL KYRGYZSTAN SITE MEDIA This Kyrgyzstan project shows mould handling and finished blocks for a 100 m³/day automated line basis.
REAL XIANNING PROJECT MEDIA The Hubei project combines the factory layout, cutting equipment and finished wall panels in one production line.
REAL AKSU RETROFIT MEDIA This retrofit connects an existing six-metre-mould AAC line with a new self-insulating block product direction.
REAL SHAOXING PROJECT MEDIA This Zhejiang project upgrades the cutting machine on an existing ceramsite block line and shows the resulting cut products.
REAL ORDOS PROJECT MEDIA The Inner Mongolia project shows connected line equipment, mould handling and finished NAAC blocks for a 300 m³/day design basis.
REAL GHANA SHIPMENT MEDIA HENGDE manufactured and shipped the equipment for this foam-concrete wall-panel line.
REAL UZBEKISTAN SITE MEDIA Site work includes foundation preparation, feeding-platform installation, cutting-system work and downstream handling installation.
REAL WUHAI PRODUCTION MEDIA The Wuhai project includes connected production equipment, a three-station cutting system and the mixing-and-pouring section.
REAL GUYUAN PRODUCTION MEDIA The Guyuan project combines cutting equipment, curing moulds and finished lightweight blocks on a 200 m³/day line basis.
REAL AKSU RETROFIT MEDIA This Aksu project uses the existing factory for a simplified self-insulating block retrofit with a 100 m³/day project basis.
REAL TACHENG PROJECT MEDIA The Tacheng project shows product measurement, finished self-insulating blocks and equipment loading for a cutting-system upgrade.
REAL KASHGAR PROJECT MEDIA The Kashgar project replaces an older circular-saw process and shows the installed cutting equipment, blocks at the machine and finished products.
REAL PRE-DELIVERY FACTORY MEDIA HENGDE completed equipment manufacturing, factory testing and dispatch for this self-insulating block line.

HENGDE configured new automation and cutting-process equipment around the customer's existing mould-forming lightweight block line before shipment.
REAL CUSTOMER PROJECT PHOTO The Côte d’Ivoire project progressed from equipment delivery into site installation. Published work includes positioning, rail installation, equipment connection and core assembly.
REAL CUSTOMER PROJECT PHOTO The Dunhuang customer selected a HENGDE production-line direction for lightweight blocks and self-insulating blocks after reviewing the factory and local material conditions.
REAL CUSTOMER PROJECT PHOTO This Inner Mongolia customer project covers a large lightweight block production-line direction using locally available industrial mineral resources.
REAL CUSTOMER PROJECT PHOTO The Wuwei project upgrades an existing self-insulating block line whose older vertical reciprocating-saw process could no longer support reliable production.
REAL CUSTOMER PROJECT PHOTO This Russia project records a HENGDE self-insulating block production direction and real media from the customer project.
REAL CUSTOMER PROJECT PHOTO HENGDE upgraded the customer’s existing block line and followed up with a visit to review the cutting equipment and factory operation.
REAL CUSTOMER PROJECT PHOTO Two published Alar records are combined here as one self-insulating block project, covering production equipment and customer-site operation.
REAL CUSTOMER PROJECT PHOTO The Hotan Pishan customer project records an operating self-insulating block line and real product media from the customer site.
REAL CUSTOMER PROJECT PHOTO The Shache project records self-insulating block production equipment and real customer-site operation in Xinjiang.
REAL CUSTOMER PROJECT PHOTO The Wensu project documents a customer self-insulating block line and real media from the project site.
REAL CUSTOMER PROJECT PHOTO This Shaanxi customer project records installation, commissioning, operator training and the start of self-insulating block production.
REAL CUSTOMER PROJECT PHOTO The Henan customer selected a customized HENGDE production-line direction for reinforced lightweight wall panels and brought the project into production.
REAL CUSTOMER PROJECT PHOTO This Kazakhstan repeat-customer project upgrades an existing block factory with automated cutting and related production equipment.
REAL CUSTOMER PROJECT PHOTO This Malaysia lightweight block project is documented from local-material testing and factory planning through agreement and equipment shipment on August 25–26, 2026.
REAL CUSTOMER PROJECT PHOTO The Xichang customer confirmed a 400 m³/day lightweight block production-line project after raw-material, factory and equipment planning.
REAL CUSTOMER PROJECT PHOTO The Hubei customer confirmed an exterior wall insulation-board production project after factory and process evaluation.
REAL CUSTOMER PROJECT PHOTO The Nepal customer selected a HENGDE lightweight wall-panel line configured for a 1.2-metre panel product.
REAL CUSTOMER PROJECT PHOTO The Timor-Leste customer confirmed a lightweight block production-line project after a multi-day factory and process evaluation.
REAL CUSTOMER PROJECT PHOTO This Laos project records HENGDE non-autoclaved lightweight block production equipment at the customer-site installation stage.
REAL CUSTOMER PROJECT PHOTO The Bazhong customer replaced an older circular-saw cutting process with a HENGDE block cutting-system upgrade.
REAL CUSTOMER PROJECT PHOTO The Hejing customer upgraded an existing AAC production line toward self-insulating block production and updated cutting equipment.
REAL CUSTOMER PROJECT PHOTO The Aksu project uses local mountain sand in an EPS self-insulating block production direction with a published 1000 m³/day project basis.
REAL CUSTOMER PROJECT PHOTO The Ili customer self-insulating block project is documented at the production stage with real customer-site media.
REAL CUSTOMER PROJECT PHOTO The Bole customer project records EPS self-insulating block production and later production-stage media from Bortala.
REAL CUSTOMER PROJECT PHOTO The Jiangxi customer selected a multi-product lightweight wall-panel equipment direction and brought the project into production.
REAL CUSTOMER PROJECT PHOTO The Urumqi customer homogeneous self-insulating block project is documented at the production stage.
REAL CUSTOMER PROJECT PHOTO The Hainan customer project uses a new cutting direction for ceramsite lightweight wall-panel production.
REAL CUSTOMER PROJECT PHOTO The Liaoning customer introduced a HENGDE foam concrete block production direction and is documented at the production stage.
REAL CUSTOMER PROJECT PHOTO The Shaoguan customer selected a customized lightweight wall-panel line for a 1.5 m × 1.25 m × 0.10 m panel specification.
REAL CUSTOMER PROJECT PHOTO The second Albania customer project progressed from factory evaluation and agreement to equipment preparation and shipment.
REAL CUSTOMER PROJECT PHOTO The Ethiopia customer reviewed HENGDE equipment and wall-material samples before signing a gypsum block production-line project.
REAL CUSTOMER PROJECT PHOTO The Yuyao customer adapted an existing AAC line for ceramsite blocks. Project photos show cutting equipment, block handling and finished products at the factory.
REAL CUSTOMER PROJECT PHOTO This Hunan project explores iron-tailings use in wall materials. Customer-site photographs show material handling equipment, blocks and the factory setting.
Compare the market, finished product, equipment scope and current project stage with your own factory plan.
Country and customer market for the published project.
Lightweight blocks, wall panels, self-insulating products or a cutting-system upgrade.
The production equipment shown for manufacturing, installation, shipment or operation.
Factory test, shipment, installation, commissioning, production or equipment upgrade.
Use the closest example as a starting point, then confirm your materials, output and site conditions.
Share your target product, raw materials, planned output and project location so HENGDE can review the relevant line modules.

Tell us your product, raw materials, target output and project country so we can review the suitable production route.